Write a Spanish site checklist for moving a bottling cell

Copy a Spanish bottling-cell relocation checklist for measured access, utility connection points and work areas.

Italiano

Capture the actual route and utilities at the receiving site while the bottling cell is still installed at origin. Use a site-approved plan with dated photos and responsible people. Record open checks in Spanish so collection and installation teams can follow the same list.

Copy these Spanish headings into the site record

Bottling-cell transfer survey
Spanish labelEvidence to collectDecision
Acceso y paso libreDoor and turn dimensions, obstructions and datesConfirm each packed module can be moved by the qualified provider
Puntos de conexiónAir, water, power and drainage location and verified dutyAssign check or adaptation
Zona de maniobra y montajeAreas for staging and approved site workAssign timing and access responsibility
Pendientes y responsablesMeasured source, named role and due dateHold commitment where a dependency is unverified

For example, a documented crate width of 1.95 m exceeds a measured clear door width of 1.90 m. Escalate that measurement before booking transport and have the qualified team verify an alternate route or scope.

The Spanish integration and commissioning guide links site evidence with the receiving work.

Send the Spanish site record and the packed module dimensions